You have to be in the market full time to uncover the best opportunities. We have a passion for real estate and we are always looking for new investments and developments to improve the built environment.


  • Resized COL2347 Fabric Stage2 S010 EXT Hero Final
  • Resized COL2347 Fabric Stage2 S020 EXT Pocket Park Final
  • Resized COL2347 Fabric Stage2 S050 INT Large Living Final
  • Resized COL2347 Fabric Stage2 S070 Medium Living Final
  • Resized COL2347 Fabricstage2 S030 EXT Entrance Final

F-A-B-R-I-C of Spring St

11 Spring St, Onehunga

Project

The second stage of the successful FABRIC apartment project to provide 98 apartments over two five level buildings with basement car parking and extensive landscaped grounds. FABRIC has redefined living in Auckland's suburban fringe. Its vibrant pocket neighbourhood is now an established contemporary residential community that brought new life to one of Auckland's fastest growing heritage neighbourhoods.

Key Construction Partners

Ashton Mitchell Architects, Greenstone Group, Kalmar Construction

Key Corporate Partners

ANZ, Colliers International, Thompson Blackie Biddles, BDO

Timeframe

2021 – Ongoing

  • Resized SYMPHONY 303 V01
  • Resized SYMPHONY 303 V03
  • Resized SYMPHONY 303 V05
  • Resized SYMPHONY 303 V07 LIGHT

Symphony303

303 Manukau Road, Epsom

Project

Symphony303 is an exclusive collection of 43 premium apartments with on-grade car parking which will see the repurposing of an existing commercial building, extending and transitioning it into a boutique new residential complex. With the green spaces of Cornwall Park adjacent or the verdant avenues of Epsom, to the North and West, Symphony303 is well connected to all Epsom's amenities and the top Auckland school zones.

Key Construction Partners

Jasmax Architects, Greenstone Group, Kalmar Construction

Key Corporate Partners

ANZ, Colliers International, Thompson Blackie Biddles, BDO

Timeframe

2021 – Ongoing

  • Resized Hero OMC V01 Large
  • OMC V02
  • Resized OMC V03
  • Resized OMC V04
  • Resized OMC V07

The Onehunga Mall Club (O.M.C.)

158 Onehunga Mall, Onehunga

Project

The Onehunga Mall Club is a collection of 102 apartments set above two levels of car parking and retail in Onehunga's heritage town centre. The eight level building provides a unique outlook and different point of view across the four corners of Auckland towards Mt Wellington in the east, Mangere Mountain to the south, Manukau Harbour to the west and to One Tree Hill to the north.

Key Construction Partners

Ashton Mitchell Architects, Greenstone Group, Kalmar Construction

Key Corporate Partners

ANZ, Colliers International, Thompson Blackie Biddles, BDO

Timeframe

2021 – Ongoing

  • Landmark House Level 5 00 02
  • Landmark House Level 5 06 07
  • Landmark House Level 5 05

Landmark House — Levels 2, 4, 5 and 6

187 Queen Street, Auckland

Project

Landmark House is one of Auckland's most distinctive character buildings constructed in 1930 as the headquarters for the Auckland Electric Power Board. Four floors were acquired during 2019, stripped back to their shells and refurbished to a high quality standard in 2020 for new office tenants. 

Key Construction Partners

CPRW Architects, Focus Construction

Key Corporate Partners

ANZ, Claymore Law

Timeframe

Ongoing

  • Fabric 1
  • Fabric 1 Hero
  • Fabric 13
  • Fabric 2
  • Fabric 4
  • Fabric 7

F-A-B-R-I-C — Stage One

64 Victoria Street, Onehunga

Project

Fabric is a new pocket neighbourhood where considered apartment living meets shared green spaces in one of Auckland’s oldest urban villages. Stage One comprised 161 apartments, basement car parking and landscaped common grounds.

Key Construction Partners

Ashton Mitchell, Greenstone Group, Kalmar Construction

Key Corporate Partners

ANZ, Colliers International, Thompson Blackie Biddles, BDO

Timeframe

2016 – 2020

  • Skhy Stage 2 Courtyard Kp Road Sam Harnett 5 Of 10 4 Resized
  • Skhy Stage 2 Courtyard Sam Harnett 5 Of 10
  • Skhy Stage 2 Courtyard Sam Harnett 5 Of 10 4 Resized

SKHY Stage Two

38 Khyber Pass Road, Newton

Project

The second stage of the successful SKHY precinct is a carefully designed mixed use development comprising 47 apartments and commercial spaces at the heart of the new Uptown. Wrapped around a leafy courtyard, the apartments are private, sunny and take full advantage of this wonderful part of our city.

Key Construction Partners

Cheshire Architects, Greenstone Group, Kalmar Construction

Key Corporate Partners

ANZ, Colliers International, Thompson Blackie Biddles, BDO

Timeframe

2016 – 2019

  • Anzac 01
  • Anzac 02

Anzac Ave Student Accommodation

128 Anzac Ave, Auckland CBD

Project

A 488 room, 21 level purpose built student accommodation tower completed in February 2020 for the start of the academic year. Unilodge manages the building for Auckland University who have taken a long term lease of the building.

Key Construction Partners

Ashton Mitchell, Greenstone Group, Kalmar Construction

Key Corporate Partners

BNZ, Cedar Pacific, Unilodge, University of Auckland, Russell McVeagh

Timeframe

2016 – 2020

  • 75 K Road 04
  • 75 K Road 09 4

75 Karangahape Road

Karangahape Road, Auckland

Project

A 1980's seven level office building located on a high profile corner site, on the edge of Auckland's education precinct. The property was purchased in 2016 with the intent to restructure short term leases and grow the underlying property income. This strategy was achieved during 2018 when the property was sold.

Key Construction Partners

Ashton Mitchell, Bayleys Property Services

Key Corporate Partners

ASB, Thompson Blackie Biddles, BDO

Timeframe

2016 – 2018

  • Skhy Stage 1 01
  • Skhy Stage 1 External Patrick Reynolds 1 Of 10 Cropped
  • Skhy Stage 1 Tower Apartment Type B Sam Hartnett 8 Of 10
  • Skhy Stage 1 Warehouse Apartment Type E Sam Hartnett 10 Of 10

SKHY Stage One

5 Hohipere Street, Newton

Project

A collaboration between Lamont & Co. and Cheshire Architects, to produce a master planned redevelopment of the former Eden House, to provide 66 luxury apartments, 3 workshops, and associated car parking. Completed in 2018, the SKHY apartments enjoy elevated city living saturated in some of the most extraordinary views of the city while the lowest levels provide a series of bespoke warehouse apartments and garden apartments with huge outdoor terraces.

Key Construction Partners

Cheshire Architects, Greenstone Group, Leighs Construction

Key Corporate Partners

ANZ, Colliers International, Thompson Blackie Biddles, BDO

Timeframe

2015 – 2018

  • Lamont 41 High St Highres 0 Jc2545 1

41 High Street

High Street, Auckland CBD

Project

A character turn of the century 2 level retail and office building strategically located between 35 and 43 High Street (other portfolio assets). The building was acquired with vacant possession and has subsequently been upgraded and leased to high quality tenants.

Key Construction Partners

Jose Gutierrez Ltd, Terra Firma Group, Focus Construction

Key Corporate Partners

ANZ, Claymore Law

Timeframe

Ongoing

  • 43 High Street

43 High Street

High Street, Auckland CBD

Project

A character 1970’s 12 level office building in the heart of Auckland city which was acquired mid-2016. The building is being progressively upgraded and refurbished for its current and prospective occupiers. 

Key Construction Partners

Jose Gutierrez Ltd, Terra Firma Group, Focus Construction

Key Corporate Partners

ANZ, Claymore Law

Timeframe

Ongoing

  • Lamont And Co Symonds Street 01
  • Lamont And Co Symonds Street 05
  • Lamont And Co Symonds Street 03
  • Lamont And Co Symonds Street 04

Unilodge

53 Symonds Street, Auckland CBD

Project

A 343 studio room, 16 level purpose built student accommodation tower central to the Auckland University campus which opened at the start of the 2017 academic year. Unilodge manage the property on behalf of the University of Auckland who have taken a long term lease of the building.

Key Construction Partners

Ashton Mitchell, Hawkins Construction

Key Corporate Partners

ANZ, Cedar Pacific, Unilodge, University of Auckland, Russell McVeagh

Timeframe

2015 – 2017

  • Peak Village

Peak Village

Peak Road, Kaukapakapa

Project

A 52 lot architecturally designed subdivision in the country setting of Kaukapakapa on Auckland’s North Shore. The subdivision was designed with extensive landscaping, wetlands, and green spaces and was completed in October 2015.

Key Construction Partners

ASC Architects, AR & Associates, Hopper Construction

Key Corporate Partners

BNZ, Key 2, Hornabrook Macdonald, BDO

Timeframe

2014 – 2015

  • 35 High Street

35 High Street

High Street, Auckland CBD

Project

A character 1920’s 8 level office building opposite Freyberg Place in the vibrant commercial centre of High Street. The building has been progressively upgraded over recent years with further refurbishment works planned.

Key Construction Partners

Jose Gutierrez Ltd, Terra Firma Group, Focus Construction

Key Corporate Partners

ANZ, Claymore Law

Timeframe

Ongoing